====================================================================== IBIS INTERCONNECT MODELING AD HOC TASK GROUP MEETING MINUTES Meeting Date: February 21, 2007 http://www.eda.org/ibis/adhoc/interconnect/ Mailing list: ibis-interconn@freelists.org Attendees: ---------- (* denotes present) Agilent - Radek Biernacki*, John Moore* Cisco Systems - Mike LaBonte* CST - Fabrizio Zanella* Intel - Michael Mirmak* Mentor Graphics Corp. - John Angulo* Micron Technology - Randy Wolff* Teraspeed Consulting Group - Bob Ross* ====================================================================== Next Meeting: Wednesday, March 7, 2007 Telephone Bridge Passcode 916-356-2663 5 942-3915 LiveMeeting Details: Subject: IBIS Ad Hoc Interconnect Meeting Meeting URL: https://www.livemeeting.com/cc/intel/join Meeting ID: DFMK69 Meeting Key: 6@+-H9Rd8 Agenda: - Final review of IIRD9 - Review of updated Touchstone(R) draft ======================================================================== No opens were raised. During review of the latest revision of the Touchstone(R) update draft, Fabrizio inquired about adding frequency-dependent reference impedances. Michael noted that this had been tabled after previous discussions indicated it wouldn't be needed. However, the team did note that the use of frequency-dependent or independent references placed a computation burden on the EDA tool vendor (in the former case) or the model provider. In order to keep the format compact, the team agreed to maintain independent references. The team reviewed the list of suggested Touchstone(R) changes from Radek Biernacki (to be posted to the website). Michael agreed to update the document with the editorial changes suggested. The major changes were discussed item-by-item. These included clarifying normalization, so that normalization, if used, would be separate from the reference impedance if the option line was overridden. Additionally, the team agreed that no line length limits would be enforced, so long as keywords and new data sets (starting with frequency points) begin at the start of new lines. The team also agreed that CSV data was not to be supported. Additionally, valid decimal syntax was to be clarified, in the style of IBIS, at the beginning of the document. ARs ----- Sam - provide a simple drawing of "virtual reference" case Michael - update IIRD9 draft with changes for final review next time - DONE Team Objectives: 1) complete ICM-IBIS linking BIRD and any associated changes to the ICM specification 2) update the ICM specification, if needed, to clarify the mapping of ICM nodes to S-parameter ports 3) complete a specification for "Touchstone Plus" or similar industry-standard definition for Touchstone-like files, to include complex impedance references, removal of limits on the maximum number of ports and per-port impedance references