====================================================================== IBIS INTERCONNECT MODELING AD HOC TASK GROUP MEETING MINUTES http://www.eda.org/ibis/adhoc/interconnect/ Mailing list: ibis-interconn@xxxxxxxxxxxxx ====================================================================== Minutes from October 22: Attendees: ---------- (* denotes present) Agilent - Radek Biernacki*, John Moore, Ken Wong Ansoft - Denis Soldo Cadence Design Systems - Terry Jernberg*, Brad Griffin Green Streak Programs - Lynne Green Hewlett-Packard - Rob Elliott* Intel - Michael Mirmak* Mentor Graphics Corp. - John Angulo*, Vladimir Dmitriev-Zdorov* Micron Technology - Randy Wolff Sigrity - Sam Chitwood, Raymond Y. Chen, Tao Su, Brad Brim SiSoft - Walter Katz* Teraspeed Consulting Group - Bob Ross* ======================================================================== No patents were announced. Michael called for comments on the current draft Touchstone 2.0 specification. Bob suggested that the team should converge on a draft without large numbers of new features. In his discussions with Walter Katz, they agreed to take port names and other proposals "off the table." The new features that still need to be discussed included: - changes to the keyword structure regarding spaces and underscores - an information section - [Data] or a similar keyword to identify and offset data blocks Walter added that both the data and information sections should be offset using a begin/end pair. On keyword structures, the equivalence of spaces and underscores is an IBIS convention but was noted by Rob as a potential problem for parsers. Rob added that nesting of [Begin ...] and [End ...] structures should be explicitly prohibited, for the same reasons. Bob provided an outline of the interconnect information keywords. At a high level, the information group would identify and gather in one place information that was not required for correct data formatting, but would be useful for data interpretation. In order to avoid biasing the specification toward any particular application, different keywords could be defined within the information section, to prevent problems with minimal parsers. The filename extension .ts was proposed as an alternative to the .snp structure. Discussion will continue in the next meeting. Walter will provide a summary list of changes/proposals to the mailing list. ======================================================================== Team Objectives: 1) complete ICM-IBIS linking BIRD and any associated changes to the ICM specification 2) update the ICM specification, if needed, to clarify the mapping of ICM nodes to S-parameter ports 3) complete a specification for "Touchstone Plus" or similar industry-standard definition for Touchstone-like files, to include complex impedance references, removal of limits on the maximum number of ports and per-port impedance references ------------------------------------------------------------------