Date: Jan 13, 1995 From: Will Hobbs (503) 696-4369, fax (503) 696-4210 Will_Hobbs@ccm2.jf.intel.com XTG Modeling Manager, Intel Corp., Chairperson, IBIS Open Forum Intel Corporation 5200 NE Elam Young Pkwy, Hillsboro, Oregon 97124 USA and Derrick Duehren (503) 696-4299, fax (503) 696-4904 Derrick_Duehren@ccm.jf.intel.com Intel Program Manager Subject: Minutes from IBIS Open Forum Meeting 1/6/95 To: ARPA Randy Harr* AT&T Global Info Systems Dave Moxley Anacad Steffen Rochel Ansoft Henri Maramis Atmel Corporation Dan Terry Cadence Design Sandeep Khanna, C. Kumar* Cadlab Ralf Bruning Contec Dileep Divkar Digital Equipment Corp. Barry Katz EIA Patty Rusher High Design Technology Michael Smith, Dr. Ing. Cosso HP Palo Alto Tom Langdorf* HyperLynx Kellee Crisafulli* IBM Jay Diepenbrock, Joseph Flanigan IBM-Motorola alliance Lynn Warriner*, John Burnett INCASES Werner Rissiek, Olaf Rethmeier* Integrated Silicon Systems Eric Bracken Intel Corporation Stephen Peters*, Don Telian, Will Hobbs* Arpad Muranyi*, Derrick Duehren* Interconnectix, Inc. Bob Ross* Intergraph Ian Dodd, David Wiens, Walter Katz IntuSoft Charles Hymowitz Mentor Graphics Ravender Goyal, Greg Doyle Meta-Software Mei Wong, You-Pang Wei, John Sliney MicroSim Arthur Wong National Semiconductor Syed Huq* NEC Hiroshi Matsumoto North Carolina State U. Steve Lipa, Michael Steer OptEM Engineering, Inc. Benny Leveille, Ken Ehn PC Ware Paul Munsey, Ron Neville* Quad Design Jon Powell* Quantic Labs Mike Ventham* Racal-Redac John Berrie Stree Co. Mon Seng(sp?) Symmetry Martin Walker Synopsys, Logic Modeling G. Bill Lattin Texas Instruments Bob Ward* Thomson-CSF/SCTF Jean Lebrun UniCAD Canada Ltd. Stephen Lum Zeelan Technology George Opsahl, Hiro Moriyasu CC: Intel Corporation Randy Wilhelm, Jerry Budelman, Intel IBIS team In the list above, attendees at the meeting are indicated by *. Upcoming Meetings: The room and bridge numbers for future IBIS teleconferences are listed below: Date Bridge Number Reservation # TBD (916) 356-9999 TBD All meetings are 8:00 AM to 10:00 AM PDT (16:00 to 18:00 UTC). We try to have agendas out 7 days before each open forum and meeting minutes out within 7 days after. When you call into the meeting, ask for the IBIS Open Forum hosted by Will Hobbs and give the reservation number. NOTE: "AR" = Action Required. ------------------------------------------------------------------------------ Check-in, Intros, Announcements New participant: Tom langdorf at Hewlett Packard at Palo Alto memory procurement. He is converting the IBIS spec to an HP internal format. The following correction was made to the 12/9/94 meeting minutes: Bob Ross pointed out that Paul Munsey attended the 12/9/94 meeting. Will commented that IBIS is now being used as a means for system design groups to communicate buffer design needs to I/O buffer design engineers, establishing a 2-way conduit of information flow to converge on workable designs at both ends. Will reported that there are now 10 paid subscribers to the 2.1 Golden Parser. New Agenda Items: Status of new updates to the Golden Parser. Press Updates: Derrick started the draft press release before the Christmas holidays and has updated the roster document for attachment. Will submitted Derrick's draft to Intel's MarCom with no response. Kellee volunteered to release the Press Release, but suggested that someone with a stronger relationship with some industry editors do it. Kumar will check with Cadence's marketing group and respond to Will. [update: Intel MarCom is involved, Cadence MarCom has offered to help] AR Will/Derrick: Post press release to the reflector. [DONE] AR Derrick: Check on EDN IBIS article status. [DONE, It is scheduled to appear in the 3/16/95 issue of EDN magazine. Derrick is also in contact with the editor to ensure he has the 2.1 press release as well.] Progress toward enlisting new IC vendors Derrick reported that Zeelan is planning to post a text message to vhdl.org advertising their IBIS model library. Lynn Warriner reported that he is ready to post PowerPC IBIS models and asked about non-ftp methods of posting them. Derrick referred him to Mike Steer's instructions posted yesterday. Mike Venthum asked if VLSI Technology is participating - No. He will contact them to see if they will get involved, and post their ASIC IBIS models. Golden Parser 2.1 progress and release date Ron reported that the original 2.0 work is done and he will distribute a disk on Monday. There are 4 minor changes to be done. Ron and Paul will provide an estimate to Will, approval of the work will be done via the reflector. {Update: The disk has been distributed.] AR Ron/Paul: Post an estimate of the work to be done to the reflector. Who are the simulator vendors that can support v2.1 and when will this support be available? - S. Huq Kellee thinks support will gradually trickle out in the coming months. Several EDA vendors shared their roll-out plans off record. Two models from Intel (under NDA) are the only two test models available. Simulator vendors can contact Syed Huq (huq@rockie.nsc.com) for National's 2.1 models that are being verified now. Compliance Will pointed out that the V/T table can be used to as a type of compliance test/sanity check. Kumar would like to see a DC check as well. AR Kumar: Post an EGG for DC checking. Status of EIA affiliation Will reported that he attempted to get Patty Rusher of the EIG (Electronic Information Group of the EIA) to join us today. Randy Harr said from his experience, we need to send the spec, a description of our balloting method, list of who voted on the final spec, and a transfer of copyright to the EIA. They mail the ballot document and the document out, for 60 day ballot time. Once affiliated, we can make the spec available on-line as well as printed. There can be a fee for the printed copy to cover production and EIA to distribution costs. As an example, EIA 567 will be freely available on-line. The balloting process costs about $1,000 per ballot. If changes are needed after the first ballot, it'll cost anther $1,000. Kellee suggests allowing open, free participation, but limiting votes to paid members. Paid members can have the parser code as a benefit. 1 vote per company (EIA rule). Kellee would like to distribute the spec with the models they distribute. AR Derrick/Will: Post draft operating procedure, copyright ownership, membership costs, benefits, and structure. FYI, Ron Werner of Motorola heads the Design Automation Division of EIA. Rev 2.1 Fallout The following items need to be updated to support/reflect the updated spec. Will has no bandwidth to work on these. Kellee suggested that if any of the EDA vendors are writing manuals that include an appendix on how to create IBIS models, they could offer it to the forum (silence). o Overview. Will suggests that someone could write an article on 2.1, retain the copyright, and provide chunks for updating the Overview. o Cookbook o S2IBIS 2.1. Kumar reported that Cadence is working with and funding NCSU to update the utility. The updated conversion utility should be available in about three months. Kumar said anyone can work with them on it. Cadence is providing some funding because it serves their interests. IBIS General Session/Summit (face-to-face) Derrick had 14.5 responses, he rated the responses for dates and places, and found 2/6 and Santa Clara were best. Location: Santa Clara (Intel Robert Noyce Building, 5-story building at 2200 Mission College Blvd. Visitor parking is to the right of the main entrance.) Intel-recommended hotels: The Westin Hotel Santa Clara Marriott Biltmore Hotel & Suites Residence Inn by Marriott Sunnyvale Hilton Date: 2/6/95 Time: 9:30 am - 5:00 pm (If you come early, you can tour the Intel museum on your own. Allow about 30 min. Enter the museum from the main lobby.) Focus: What people are doing with IBIS, technically as well as politically, brainstorming, future direction (3.0 possibilities), and relationship building. Kumar suggested discussing series termination. Stephen wants to discuss alternative packaging representations. Will and Jon suggested diode storage effects. AR All -- Send agenda items and requests for time to Derrick and Will by 1/27/95. AR All -- Send a request to Derrick with your fax number if you want a map. Wrap-up, Next Meeting Plans Our next meeting is 1/27/95. AR Will -- Ask Patty Rusher to attend the meeting. Also ask Intel's Architecture Design Lab personnel to discuss their interest in diode storage effects. ============================================================================== NOTES If you know of someone new who wants to join the e-mail reflector (ibis@vhdl.org), send e-mail to ibis-request@vhdl.org. Check the pub/ibis directory on vhdl.org for more information on previous discussions and results. You can get on via ftp anonymous, "guest" login from telnet or dial-in (415-335-0110), or send an email request to the automatic archive server, archive@vhdl.org. ==============================================================================