raghu wrote:
>
> D.C.,
>
> The table length reduction scheme looks very attractive. One could start with much more than 100 points and reduce them
> to 100 "good" points. If you are talking about v-t curves, for example, how do you ensure that the same time points are
> good for typ, min, or max. The table, I think, can have only 100 time points and they have to be the same for typ, min,
> or max. Or is it your experience that this is not such a big constraint?
The published software takes the greatest error of the for typ, min, and max.
That way, if deleting a line would mess up any of the three it gets kept.
-- D. C. Sessions dc.sessions@vlsi.comReceived on Wed May 10 15:54:01 2000
This archive was generated by hypermail 2.1.8 : Fri Jun 03 2011 - 09:52:30 PDT