ASIAN IBIS SUMMIT (SHANGHAI) AGENDA

 

Time/Date:  8:15 - 17:30, Friday, November 11, 2016

 

Sponsors:   Huawei Technologies (Primary)

            Cadence Design Systems

            IO Methodology

            SPISim

            Synopsys

            Teledyne LeCroy

            Xpeedic Technology

            ZTE Corporation

 

Booklet:    booklet.pdf(cover.pdf)

Minutes:    m111116.pdf


 

8:15    SIGN IN

         - Vendor Tables Open at 8:30

 

8:45    WELCOME

          - Zhang, Gezi

              (Huawei Technologies, PRC)

          - LaBonte, Mike (Chair, IBIS Open Forum)

              (Signal Integrity Software (SiSoft) USA)

 

9:00    IBIS Chair's Report

          LaBonte, Mike (Signal Integrity Software (SiSoft), USA)

 

9:25    IBIS Model Simulation with RLC_dut

          Chen, Xuefeng (Synopsys, PRC)

 

9:55    Case Study: Modeling IBIS for Open_drain True

        Differential Pair Buffer

          Wang*, Lance; Liang**, Yan

          (*IO Methodology and **Maxim Integrated, USA)

          [Presented by Wang, Lance (IO Methodology, USA)]

 

10:20   BREAK (Refreshments and Vendor Tables)

 

10:40   Differential Modeling Flow with Series Model in Verilog-A

          Huang*, Wei-hsing and Gupta**, Sanjeev

          (*SPISim, USA and **Sigintegrity Solutions, India)

          [Presented by Huang, Wei-hsing (SPISim, USA)]

 

11:10   IBIS-AMI Model Generation with Quality

          Liang, Skipper (Cadence Design Systems, ROC)

          [Presented by Wen, Yitong (Cadence Design Systems, PRC]

 

12:00   FREE BUFFET LUNCH (Hosted by Sponsors)

          - Vendor Tables

 

13:30   Suggestion on Issuing VSR/CAUI-4 Based IBIS-AMI Model

          Xu, Zhengrong (Huawei Technologies, PRC)

 

13:50   Necessity for Integrating FEC Functionality for PAM4 in

       AMI Simulations

          Dong*, Xiaoqing; Huang**, Nick

          (*Huawei Technologies,

          **Shenzhen Zhongzeling Electronics, PRC)

          Presented by Huang, Nick

           (Shenzhen Zhongzeling Electronics, PRC)]

 

14:10   The Impact of Channel Performance to 56G PAM4 Systems

          Yin, Changgang; Zhu, Shunlin (ZTE Corporation, PRC)

          [Presented by Yin, Changgang (ZTE Corporation, PRC)]

 

15:00   BREAK (Refreshments and Vendor Tables)

 

15:20   Achieving Full System Signal Integrity for High Speed

       Backplane System

          Dai, Wenliang (Xpeedic Technology, PRC)

 

15:50   On-Die Decoupling Model Improvements for IBIS Power

       Aware Models

          Wolff#, Randy; Viscardi##, Aniello

          (Micron Technology; #USA, ##Italy)

          [Presented by Wang, Lance (IO Methodology, USA)]

 

16:15   IBISCHK6 V6.1.3 and Executable Model File Checking

          Ross, Bob (Teraspeed Labs, USA)

          [Presented by LaBonte, Mike

          (Signal Integrity Software (SiSoft), USA)]

 

16:40   Touchstone Conversion Wrapper

          Ekholm, Anders (Ericsson, Sweden)

 

17:05   DISCUSSION

 

17:20   CONCLUDING ITEMS

 

17:30   END OF IBIS SUMMIT MEETING

 

------------------------------------------------------------------